taggalongRevenue Cloud field guide
Menu
Usage · Cheat sheet

Cheat sheet: Usage

Must-know terms

  • Usage Management's five parts: Usage Modeling, Rate Management, Usage Selling, Consumption Management, Wallet Management.
  • Usage resource: the thing metered, with a unit of measure class, a default unit, a category (Usage, Token, Currency), and a usage definition product used for tax, overage rating and invoicing.
  • Usage model type on the product: Anchor (main plan), Pack (add-on grants), Token, Quantity, or Monetary Commitment (stored as Commit, CommitmentQuantity, CommitmentSpend).
  • Product usage resource: links a resource to a product; one token resource per product; Optional only for commitments. Product usage resource policy overrides the resource's own usage resource policy.
  • Product usage grant: the included allowance. Quantity, type Grant or Commit, validity period, refresh and rollover policies, drawdown order (Expiring First by default, Granted First, Granted Last).
  • Grant binding: Self (the default; anchors only on the quote line) or Target (Product, Account, Contract, Custom). Commitments can't bind; they link through a Usage Commitment Asset Related Object.
  • Rate card: Base (flat rate) or Tier (adjustments by quantity). Tier adjustments: Percentage, Amount, Override. Only Active entries rate. Price Book Rate Card plus a Rating Discovery Procedure in Revenue Settings bring rates to the quote.
  • Tokens: Points Per Unit (usage to tokens) then Price Per Point (tokens to money), so two rate card entries: rate unit the token, then rate unit the currency.
  • Activation creates transaction usage entitlements (PENDING to PROCESSED), a usage entitlement account (billing cycle), and usage entitlement buckets (parent per resource and target, child per grant), with entries for every credit and debit.
  • Transaction journal: one usage record against the asset, Pending until orchestration. Orchestrate Usage Management produces the usage summary, usage ratable summary, and liable summary (usage billing period item, Ready for Invoicing).
  • Unified Usage Dashboard: Usage Details, Grants, Policies, Rates, Wallets, from the account (pooled) or asset (Self).

Numbers and limits

Limit Value
Lines per quote or order 200
Quote line item rate card entries 200
Quote line item rate adjustments 800
Rate card entries per org 1,200
Tier adjustment records per org 3,000
Token resources per product 1
Default rating delay for late usage 3 days
Validator gap warning More than 12 hours
Guided workflow 200 resources listed, 10 selected at once, 20 product usage resources, 5 grants each, 3 mandatory custom fields
QuantumBit Database example 50 TB used, 10 TB granted, 40 over at 15 = 600
Token example 25,500 tokens, 10,000 granted, 15,500 over at 0.50 = 7,750

Decision rules

  • Main metered plan: Anchor. Top-up: Pack bound to the anchor or its target. Discount for a promise: a commitment, sold separately and linked to the anchor.
  • Anchor or pack, first time: guided workflow (Configure Usage Properties). Commitment products: manual setup. Then run the Usage Product Validator.
  • Usage products never go in a bundle, as child or parent. Sell them as separate lines; usage and non-usage lines can share an order.
  • One pool for the whole account: bind to Account. Per agreement: Contract. Per tenant or other key: Custom. Decide before the first order; the target can't change after assetization.
  • Total for the period: aggregation Sum. Highest point: Peak. Quarterly reset: refresh every 3 Months. Carry over with a limit: rollover with Allow Rollover Expiry.
  • After the commitment: anchor's rate is Bounded Object Rate; keep the discount is Lowest Commitment Rate. Token commitment discounts apply only with Lowest Commitment Rate.
  • No rates on the quote: Active entries, Price Book Rate Card, Rating Discovery Procedure, and a Unit Code that matches the currency ISO code exactly.
  • Attribute-based rate cards aren't supported in Usage Selling and Consumption Management.
  • Consumption Management doesn't process monetary or quantity commitments; token commitments do rate.
  • Late usage: after Usage Summary Complete, journals for that period are ignored. Launchpad rule: record before the first orchestration, into a past period, against the anchor.
  • Backdated order: run Call Entitlement Refresh Service. Schedule the entitlement refresh before Orchestrate Usage Management, in System Context without Sharing.
  • Usage invoices need the Billing license, a scheduler filter of All or Usage, and a liable summary at Ready for Invoicing. Usage billing schedules are never Completely Billed.

Objects

Object Role
UnitOfMeasureClass, UnitOfMeasure, UsageResource What's metered and how it's counted
Product2 (UsageModelType), ProductUsageResource, ProductUsageGrant The usage product, its resources, its allowances
ProductUsageResourcePolicy, UsageResourceBillingPolicy, RatingFrequencyPolicy, UsageOveragePolicy, UsageCommitmentPolicy, UsageGrantRenewalPolicy, UsageGrantRolloverPolicy, UsagePrdGrantBindingPolicy Aggregation, rating frequency, overage, commitment rate, refresh, rollover, binding
RateCard, RateCardEntry, RateAdjustmentByTier, PriceBookRateCard Rates, tiers, and the price book link
UsageCmtAssetRelatedObj Links a commitment asset to its anchor
TransactionUsageEntitlement, UsageEntitlementAccount, UsageEntitlementBucket, UsageEntitlementEntry Run-time allowances, billing cycle, wallets, credits and debits
TransactionJournal Recorded usage
UsageSummary, UsageRatableSummary, UsageBillingPeriodItem Aggregation and drawdown, rating, invoice-ready liable summary
BillingSchedule (BillingMethod Usage), InvoiceLine (IsUsageBasedInvoiceLine) Usage on the billing side

Back to the guide page